Cell DV/PV Testing Engineer, Ford Energy
Ford Motor Company
With an account: save jobs, track applications, build tailored resumesAlready have an account? Log in
- Location
- Dearborn, MI
- Job type
- Full time
- Posted
- Oct 26
- 2 days ago
Career path
See where this role leads
Jigup maps the next three moves from a job like this one, with the titles and the skills each step asks for.
About the company
Ford Motor Company
Automotive · 10,001+ employees
What you need
- Bachelor's degree in Electrical, Chemical, Mechanical, Materials, or a related engineering discipline.
- 3+ years of experience testing battery cells or battery systems in a lab or validation environment.
- Hands-on experience setting up and operating battery cyclers, environmental/thermal chambers, and data acquisition systems.
- Working knowledge of DV/PV testing methodology and DVP&R/PVP&R documentation, with a strong grounding in cell performance and life test methods.
- Experience or working knowledge of failure analysis and teardown techniques for battery cells (mechanical disassembly, visual/optical inspection, electrical characterization).
- Experience tracking or analyzing test results generated by external suppliers or test labs.
- Ability to read and interpret test specifications, engineering drawings, and cell datasheets.
- Strong data analysis skills (Excel and/or MATLAB/Python) and clear technical report writing.
- Ability and willingness to work in a lab environment with battery test articles, including required PPE and safety protocols.
- Ability and willingness to travel occasionally to supplier or external test lab sites.
- Master's degree in Electrical, Chemical, or Materials Engineering.
- Experience with LFP (lithium iron phosphate) or sodium-ion cell chemistries and their characteristic performance and life behavior.
- Experience performing cell teardown and failure analysis, including use of techniques such as SEM, XRD, CT scanning, or similar diagnostic tools (directly or via coordination with a materials/failure-analysis lab).
- Experience supporting production teams during process validation (PV) builds, including real-time troubleshooting and non-conformance resolution.
- Exposure to evaluating or developing next-generation/alternative cell chemistries for energy storage applications.
- Experience supporting cell supplier qualification, including review of DFMEA/PFMEA, control plans, and PPAP documentation.
- Experience in the BESS, EV, or stationary storage industry.
- Six Sigma, IATF 16949, or ISO 17025 lab quality experience.
- Experience correlating cell-level performance and life data and failure analysis to module/pack-level performance outcomes.
- DV/PV test execution and DVP&R/PVP&R documentation
- Cell performance and life characterization (capacity, impedance/DCIR, rate/power, cycle life, calendar life)
- Battery cycler and environmental/thermal chamber setup and operation
- Supplier test tracking and results analysis
- Degradation trend and out-of-spec investigation
- Test data reduction and technical reporting
- Cross-functional coordination with design, quality, and supplier engineering
- Physical Demands & Working Conditions
- This role is primarily performed in an office, laboratory, manufacturing, or supplier environment, depending on program needs.
- Occasional work in high-voltage or industrial environments may be required, with appropriate training and personal protective equipment (PPE).
- Ability and willingness to travel occasionally to support testing, supplier, manufacturing, or customer activities.
- Location & Travel
- This position is based in Dearborn, Michigan.
- Travel may be required to support supplier, manufacturing, laboratory, and customer activities.
See full description on company page, apply now
Read the full posting here
About Ford Energy
Ford Energy is a newly formed, wholly owned subsidiary of Ford Motor Company dedicated to accelerating US energy independence. Leveraging Ford’s century of manufacturing excellence and world-class battery energy storage systems (BESS) technology, Ford Energy designs, manufactures, and services grid-scale and commercial DC battery energy storage systems (BESS). Ford Energy is uniquely positioned to capture the growing demand for reliable, US-built energy storage systems. We are not just building batteries; we are building the infrastructure for the next generation of the American grid.